Rack
video
Rack

Rack Mounted Load Banks

In order to meet the requirements of the next generation of high-density, intelligent and low pue in the data center, the corresponding load of the micro module is also evolving iteratively.

1


PRODUCT OVERVIEW


In order to meet the requirements of the next generation of high-density, intelligent and low pue in the data center, the corresponding load of the micro module is also evolving iteratively. The rack mounted resistive load bank is an important test tool, which realizes the simulation and replacement of L2 layer equipment (conventional server, high-density server and high-density router) in the computer room through the adjustment of heat source and air volume.


PRODUCT PICTURE AND APPLICATION




PARTIAL PARAMETERS



Note: all parameters are for reference only and can be customized

Product name

rack load bank

Rated voltage

AC250V

Maximum load power

According to customer needs

Load grading

According to customer needs

Load accuracy (per gear)

±2 percent

Connection mode

Three input,independent control power input

Control power

AC220V/50Hz

Insulation class

F

Air volume

The maximum air volume is 1200 ㎡/h, which supports manual mode / automatic mode and can be adjusted

Cooling mode

Forced air cooling,forward air,rear air

Control mode

Load switching of manual miniature circuit breaker

Protection function

High temperature alarm(70 degree )

high temperature automatic unloading(85 degree )

Color

Customized

Ambient temperature

-20 degree to 50 degree

Humidity

Up to 100 percent

Altitude

Up to 2500m

Atmospheric pressure

86 to 106kPa


MORE SPECIFICATIONS



Power(kW)

Voltage(V)

Frequency(Hz)

Height

Loading step

3

220/240

50/60

3U

0.5kW

3.5

220/240

50/60

3U

4

220/240

50/60

4U

4.5

220/240

50/60

4U

5

220/240

50/60

4U

6

220/240

50/60

6U

7

220/240

50/60

6U

8

220/240

50/60

8U

9

220/240

50/60

8U

10

220/240

50/60

8U

12

220/240

50/60

12U


PROTECTION FUNCTION


1. Fire protection: the resistance module is separated by copper studs, and the mica plate is separated from the bottom plate to achieve the effect of fire prevention.

2. Temperature protection: alarm when the temperature reaches 55 degree and disconnect the load. After disconnecting the load, the alarm needs to be removed before restarting the equipment.

3. Overload protection: alarm when the load exceeds 3500W and disconnect the load. After disconnecting the load, it is necessary to clear the alarm before restarting the equipment.

4. Fan: the fan can realize the air volume of 0-1200, and there is a 3-minute fan to delay the heat dissipation after the operation.


Populaire tags: rack mounted load banks, China, suppliers, manufacturers, factory, customized, price, quotation

(0/10)

clearall